×
Banner
Current Location:Home > News Center

Safety Operating Procedures for Oilfield Workover Tools

Oilfield workover operations are high-risk industrial activities, and the proper use of workover tools is critical to ensuring personnel safety and maintaining project progress. All operators must undergo professional training before working on-site.
Before operation, inspect all equipment connections, the hydraulic system, clamping components, and safety devices. Do not begin operation if any parts are loose, damaged, or abnormal. During operation, strictly adhere to load limits; never overload any clamps, lifts, or handling tools.
Under high-pressure and high-load operating conditions, avoid standing within the torque rotation zone to prevent accidental injury. After operation, disconnect the power supply and release the hydraulic pressure before disassembling the tool.
Regular safety training and standardized operational management can effectively reduce construction risks and improve overall operational efficiency at the oilfield.

« »
Feel free to leave a message online
Our experienced technical team provides you with personalized, professional services and offers efficient, one-on-one solutions.




    footlogo
    Precision Smart Manufacturing, Exceptional and Reliable Performance
    Contact
    • Phone: +86-15142708558
    • Address: 7th Floor, Shuangchuang Building, Zhonghua North Road, Xinglongtai District, Panjin City, Liaoning Province, China
    • Official Website: https://www.oil-equip.com
    • 邮箱:Panjingelushi@163.com
    Copyright © 2026 Panjin Grushi Fluid Equipment Co., Ltd. All rights reserved.
    Customer Service Hotline:
    +86-0427-2296988
    +86-15142708558

    WeChat 15142708558